High-pressure valve testing chamber
High-pressure valve testing chamber
Engineering of a 3 × 3 × 3 m hydro / gas pressure test enclosure for valve testing.
Projects & case studies
Each reference states what we were asked to do, how we did it and what was delivered. Clients are described by type and location; end clients are named for Saudi Aramco and ADNOC projects.

Engineering of a 3 × 3 × 3 m hydro / gas pressure test enclosure for valve testing.
Detailed engineering of onshore and offshore scraper traps (launchers, receivers and bi-directional) and their accessories, from 6" to 64", including traps for end client Saudi Aramco.
Two linked assignments through an EPC contractor, end client ADNOC.
Engineering design and analysis for the tank jacking methodology used to replace the bottom plate of an existing storage tank, end client ADNOC.
Burner management system engineering for existing fired heaters at a refinery in the UAE. EnggDesign acted as BMS specialist.
Our fired-heater recommendations, such as electronic ignition, continuous pilots and pre-ignition purge, follow NFPA 86 and CSA B149.3 practice.
Discuss a similar project

Piping stress analysis for a gas dehydration unit (DeHy tower) in the Czech Republic.


Skid engineering for a European client: structural, equipment, piping, 3D modelling, E&I, isometrics, BOM and stress analysis.


A multi-effect evaporation (MEE) system with an agitated thin-film dryer (ATFD) for powder preparation, built as five skids.


Complete skid engineering through an EPC contractor for a refinery in India.


CFD of an industrial-process duct and cyclone: fluid flow with particle heat transfer.


Homogeneous mixing in a stirred tank reactor.


CFD to confirm the skid's dual function: transport a large volume of fluid, and divert a small, stable sidestream for accurate density measurement.
Consultancy for a US client on a fired heater.
A multi-year integrity programme for a chemical producer in India.


Skid and plant engineering for a 350 KL distillery in Uttar Pradesh, India.


Detailed engineering, fabrication and supply of 32 equipment items, including agitated and limpet-coil reactors and shop tanks.


Plant engineering for a refrigeration-chilling plant in India.










Why clients come back
What EPC contractors and plant owners tell us they value when they return with their next package.
Calculations and drawings checked against the governing codes and client specifications before they leave us, so review cycles stay short.
Schedules agreed at kick-off and tracked weekly, with early warning when an input is late. No surprises at the deadline.
Client data, product designs and project details stay within the project team. NDAs are routine.
Reference list
From our project track record. Full references are available on request during pre-qualification.
| Client type | Location | Scope | Activities |
|---|---|---|---|
| Contractor | Saudi Arabia · end client Saudi Aramco | Pipeline equipment engineering | Design calculations, GA & fabrication drawings, FEA of QOC and nozzles |
| EPC | UAE · end client ADNOC | Equipment engineering | Design of 20 equipment items, GA & fabrication drawings, validation for change of service |
| EPC | UAE · end client ADNOC | Analysis | Flare-line branch connection FEA, nozzle and fatigue analysis |
| EPC | UAE · end client ADNOC | Tank analysis | Bottom plate replacement: design and analysis of the tank jacking methodology, shell and bracket checks |
| Contractor | International | Equipment engineering | Design calculations, GA & fabrication drawings |
| Contractor | India | Equipment engineering | Design calculations, GA & fabrication drawings |
| EPC | Qatar | Equipment engineering | Heat exchanger engineering |
| EPC | India | Equipment engineering | Valve testing chamber engineering |
| EPC | India | Skid engineering | Three-skid filtration package |
| EPC | Europe | Skid engineering | Skid structure design & harmonic analysis, U-Stamp engineering (7 items), piping & 3D |
| Owner | India | Life assessment | Life assessment of 26 equipment items, piping stress analysis, equipment engineering & supply |
| EPC | — | Fatigue analysis | Equipment engineering and fatigue analysis of 7 equipment items |
| EPC | — | CFD analysis | Basic engineering, CFD flow & thermal analysis, agitator performance for 3 reactors |
| Owner | India | Plant engineering | Equipment, piping 3D and E&I for 300 KL RS, 250 KL RS (modification) and 150 KL ENA plants |
| Contractor | India | Equipment engineering | Design calculations, GA & fabrication drawings |
Talk to our engineering team
Send the scope, governing codes and schedule. An engineer, not a sales desk, reviews every enquiry.